Signal Person Score Sheet

    Candidate Information
    Candidate Last Name*
    Candidate First Name*
    Candidate’s Company*
    Candidate Email*
    Date of Testing*
    SPYDERCRANE Qualification Number (if already in SLS database):
    Examiner Name*


    Task 1 - Choose 5 Elements to Test - Pass/Fail
    Stop Emergency Stop
    Hoist Lower
    Extend Telescopic Boom Retract Telescopic Boom
    Extend Telescopic Boom (1-handed) Retract Telescopic Boom (1-handed)
    Lower Boom Raise Boom
    Lower Boom and Raise Load Raise Boom and Lower Load
    Move Slowly (may be added to any command but counts as 1 command) Use Main Hoist
    Use Auxiliary Hoist (Whipline) Dog Everything
    Travel Travel Both Tracks
    Travel Left Track Travel Right Track



    Task 2 - Pass/Fail
    The candidate safely signaled the hook from Start to Target 1
    The candidate completed this task in under 10 minutes


    Task 3
    The candidate safely passed through the corridor
    Number of times the chain was lifted off the ground / hook raised above the cones
    Number of times the hook touched the ground
    Number of times a bean bag/cone was touched by the chain
    Number of times the chain/hook left the corridor
    Number of incorrect/incomplete commands


    Task 4
    Method of blocking the operator’s vision used
    The candidate safely passed through the corridor
    Number of times the chain was lifted off the ground / hook raised above the cones
    Number of times the hook touched the ground
    Number of times a bean bag/cone was touched by the chain
    Number of times the chain/hook left the corridor
    Number of incorrect/incomplete commands